• Main INDEX
  • Monthly INDEX
  • PREV
  • NEXT

    User name adaq

    Log entry time 23:45:19 on February 3, 2000

    Entry number 32326

    keyword=Beam Time Accounting
    Hall A

    2/3/2000 1600-2400
    Experiment #: E89-044
    Shift Leader: Eric Voutier
    Shift Workers: Vina Punjabi, Akila Frahi-Amroun, Arun Saha

    16001700180019002000210022002300Total Time
    Acceptable Beam
    in Use
    0.5 1.0 1.0 0.0 0.0 0.5 1.0 1.0 5
    Beam Available
    but Not in Use
    0 0 0 0 0 0 0 0 0
    Beam Not Available
    or Unacceptable
    0.5 0 0 1.0 1.0 0.5 0 0 3
    Accelerator Con-
    figuration Chage
    0 0 0 0 0 0 0 0 0
    Experiment
    Ready
    1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 8
    Planned Config-
    uration Change
    0 0 0 0 0 0 0 0 0
    Unplanned
    Experiment Down
    0 0 0 0 0 0 0 00
    Hall not
    ready reasons
    Target 0 0 0 0 0 0 0 0 0
    HRSe 0 0 0 0 0 0 0 0 0
    HRSh 0 0 0 0 0 0 0 0 0
    Data Acq 0 0 0 0 0 0 0 0 0
    Other 0 0 0 0 0 0 0 0 0

    Comments: HARP/BPM Calibration Hang for 1/2 hour to let hall B optimize their gun Hang for some longer time to get high current in the injector

    Data Entry by: Eric Voutier