Main INDEX
Monthly INDEX
PREV
NEXT
User name Tieulent
Log entry time 00:04:02 on February 5,2000
Entry number 32619
keyword=Shift summary
17.40 : Electron spectrometer set at : P_e = 694 MeV and Theta_e = 91.19 deg.
MCC does a BPM calibration by doing an ISCAN.
Beam Position : X=0.9 Y=-1.8
Run 1845: ps1=1, ps2=10, ps3=1, ps4=10,ps5=65000, ps8=65000 ** Short Run **
Run 1846 : change ps5 =1 Current ranges from 1uA to 50uA
Start Kinematic #21
-------------
18:10
*Run 1847 : ps1= 1, ps2=10,ps3=1,ps4=10,ps5=1 I=10uA *** Small run to check spot size and pscale factors***
18:20 *** Problem with the beam, Go to tuned mode to do orbit check ***
19:10
*Run 1848 ps1=5,ps2=40,ps3=20,ps4=600,ps5=1 *** Check Spot size ***
20.00 The problem in the injector persist decide to go to controlled Access
20.40 Start the access
10.50 End of the access
*run 1849 junk
*Run 1850 : Spot size check
*Run 1851 : ps1=5,ps2=40,ps3=20,ps4=600,ps5=1 I=95uA DT=1%