• Main INDEX
  • Monthly INDEX
  • PREV
  • NEXT

    User name Tieulent

    Log entry time 00:04:02 on February 5,2000

    Entry number 32619

    keyword=Shift summary

    17.40 : Electron spectrometer set at : P_e = 694 MeV and Theta_e = 91.19 deg.
    MCC does a BPM calibration by doing an ISCAN.
    Beam Position : X=0.9 Y=-1.8
    Run 1845: ps1=1, ps2=10, ps3=1, ps4=10,ps5=65000, ps8=65000 ** Short Run **
    Run 1846 : change ps5 =1 Current ranges from 1uA to 50uA

    Start Kinematic #21
    -------------
    18:10
    *Run 1847 : ps1= 1, ps2=10,ps3=1,ps4=10,ps5=1 I=10uA *** Small run to check spot size and pscale factors***
    18:20 *** Problem with the beam, Go to tuned mode to do orbit check ***
    19:10
    *Run 1848 ps1=5,ps2=40,ps3=20,ps4=600,ps5=1 *** Check Spot size ***
    20.00 The problem in the injector persist decide to go to controlled Access
    20.40 Start the access
    10.50 End of the access
    *run 1849 junk
    *Run 1850 : Spot size check
    *Run 1851 : ps1=5,ps2=40,ps3=20,ps4=600,ps5=1 I=95uA DT=1%