• Main INDEX
  • Monthly INDEX
  • PREV
  • NEXT

    User name adaq

    Log entry time 16:08:41 on February 5, 2000

    Entry number 32686

    keyword=Beam Time Accounting
    Hall A

    2/5/2000 0800-1600
    Experiment #: E89-044
    Shift Leader: John Calarco
    Shift Workers: Michael Kuss, Eric Liatard

    08000900100011001200130014001500Total Time
    Acceptable Beam
    in Use
    1 0.75 0.75 0.5 0.5 0 0 0 3.5
    Beam Available
    but Not in Use
    0 0.25 0.25 0.5 0.5 1 0.5 0 3
    Beam Not Available
    or Unacceptable
    0 0 0 0 0 0 0.5 1 1.5
    Accelerator Con-
    figuration Chage
    0 0 0 0 0 0 0 0 0
    Experiment
    Ready
    1 0.75 0.75 0.5 0.5 0 0 0.5 4
    Planned Config-
    uration Change
    0 0.25 0.25 0.5 0.5 1 1 0.5 4
    Unplanned
    Experiment Down
    0 0 0 0 0 0 0 00
    Hall not
    ready reasons
    Target 0 0.25 0.25 0.25 0 0 0 0 0.75
    HRSe 0 0 0 0.25 0.5 0 0 0 0.75
    HRSh 0 0 0 0 0 1 1 0.5 2.5
    Data Acq 0 0 0 0 0 0 0 0 0
    Other 0 0 0 0 0 0 0 0 0

    Comments: Lack of beam usage between 800 and 1430 due to planned target changes and spectrometer settings. beam lost at 1430 due to injector problems

    Data Entry by: Calarco