    User name adaq

    Log entry time 00:04:11 on February 6, 2000

    Entry number 32796

    keyword=Beam Time Accounting
    Hall A

    2/5/2000 1600-2400
    Experiment #: E89-044
    Shift Leader: D.W.Higinbotham
    Shift Workers: C. Perdrisat, F. Benmokhtar

    16001700180019002000210022002300Total Time
    Acceptable Beam
    in Use
    0 0 1 1 1 1 1 .6 5.6
    Beam Available
    but Not in Use
    0 0 0 0 0 0 0 .4 0.4
    Beam Not Available
    or Unacceptable
    1 1 0 0 0 0 0 0 2
    Accelerator Con-
    figuration Chage
    0 0 0 0 0 0 0 0 0
    Experiment
    Ready
    1 1 1 1 1 1 1 0.6 7.6
    Planned Config-
    uration Change
    0 0 0 0 0 0 0 0 0
    Unplanned
    Experiment Down
    0 0 0 0 0 0 0 0.40.4
    Hall not
    ready reasons
    Target 0 0 0 0 0 0 0 0 0
    HRSe 0 0 0 0 0 0 0 0 0
    HRSh 0 0 0 0 0 0 0 0 0
    Data Acq 0 0 0 0 0 0 0 .2 0.2
    Other 0 0 0 0 0 0 0 0 0

    Comments: Beam Back at 6 pm At 7 pm an alarm for Hydrogen leak sounded.. Mark Stevens checked the problem and determined that it was only a fault in the sensor. Problems with er1 and roc14. killed coda and cont.

    Data Entry by: Higinbotham