0800 | 0900 | 1000 | 1100 | 1200 | 1300 | 1400 | 1500 | Total Time | |
---|---|---|---|---|---|---|---|---|---|
Acceptable Beam in Use | 1.0 | .9 | 0.5 | 1 | .9 | 0 | 0 | 1 | 5.3 |
Beam Available but Not in Use | 0 | .1 | 0 | 0 | .1 | 1. | 1. | 0 | 2.2 |
Beam Not Available or Unacceptable | 0 | 0 | 0.5 | 0 | 0 | 0 | 0 | 0 | 0.5 |
Accelerator Con- figuration Chage | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
Experiment Ready | 1. | 0.9 | 0.8 | 1 | 0.9 | 0. | 0 | 1 | 5.6 |
Planned Config- uration Change | 0 | 0.1 | 0.2 | 0 | .1 | 1. | 1. | 0 | 2.4 |
Unplanned Experiment Down | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
Hall not ready reasons | |||||||||
Target | 0 | 0 | 0.1 | 0 | .1 | 0 | 0 | 0 | 0.2 |
HRSe | 0 | 0 | 0 | 0 | 0 | .9 | 1. | 0 | 1.9 |
HRSh | 0 | 0 | 0 | 0 | 0 | .9 | 1. | 0 | 1.9 |
Data Acq | 0 | 0 | 0.1 | 0 | 0 | 0 | 0 | 0 | 0.1 |
Other | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
Comments: Team : Serge Kox, Fatiha Benmoktar, Akila Amroun, Eric Liatard 8:30 Beam increased from 80 to 100 microA Start run 2017 (physics) 9:55 Harp scan (5micrA, OTR on, raster off, 12C) 10:10 Check raster (5microA, 12C, OTR On, raster ON) (run 2018-2019) 10:10 accelerator off ... 10:20 DAQ back to running conditions 10:50 Beam back. Start run 2020. (physics) 12h10 End of run 2020 (some trips during the run) 12h10 Start run 2021 (physics) 12h55 Start run 2022 (12C, raster off, OTR in, 50microA, PS:1,1,1,...) 13h10 Stop run. Go for controled access (change angles of spectrometers) 14:40 Back to beam permitt 15h Start run 2023 (physics) 15h15 Start run 2064 (physics) 15h30 Start run 2027 (physics) 15h40 Start run 2028 (physics) 15h50 Start run 2029 (physics) 16h ... end of the shift
Data Entry by: Serge Kox