• Main INDEX
  • Monthly INDEX
  • PREV
  • NEXT

    User name adaq

    Log entry time 16:03:45 on February 9, 2000

    Entry number 33245

    keyword=Beam Time Accounting
    Hall A

    2/9/2000 0800-1600
    Experiment #: E89-044
    Shift Leader: Serge Kox
    Shift Workers: Akila Frahi-Amroun, Eric Liatard, Eric Voutier/ Raphael Tieulent (TO)

    08000900100011001200130014001500Total Time
    Acceptable Beam
    in Use
    1.0 .9 0.5 1 .9 0 0 1 5.3
    Beam Available
    but Not in Use
    0 .1 0 0 .1 1. 1. 0 2.2
    Beam Not Available
    or Unacceptable
    0 0 0.5 0 0 0 0 0 0.5
    Accelerator Con-
    figuration Chage
    0 0 0 0 0 0 0 0 0
    Experiment
    Ready
    1. 0.9 0.8 1 0.9 0. 0 1 5.6
    Planned Config-
    uration Change
    0 0.1 0.2 0 .1 1. 1. 0 2.4
    Unplanned
    Experiment Down
    0 0 0 0 0 0 0 00
    Hall not
    ready reasons
    Target 0 0 0.1 0 .1 0 0 0 0.2
    HRSe 0 0 0 0 0 .9 1. 0 1.9
    HRSh 0 0 0 0 0 .9 1. 0 1.9
    Data Acq 0 0 0.1 0 0 0 0 0 0.1
    Other 0 0 0 0 0 0 0 0 0

    Comments: Team : Serge Kox, Fatiha Benmoktar, Akila Amroun, Eric Liatard 8:30 Beam increased from 80 to 100 microA Start run 2017 (physics) 9:55 Harp scan (5micrA, OTR on, raster off, 12C) 10:10 Check raster (5microA, 12C, OTR On, raster ON) (run 2018-2019) 10:10 accelerator off ... 10:20 DAQ back to running conditions 10:50 Beam back. Start run 2020. (physics) 12h10 End of run 2020 (some trips during the run) 12h10 Start run 2021 (physics) 12h55 Start run 2022 (12C, raster off, OTR in, 50microA, PS:1,1,1,...) 13h10 Stop run. Go for controled access (change angles of spectrometers) 14:40 Back to beam permitt 15h Start run 2023 (physics) 15h15 Start run 2064 (physics) 15h30 Start run 2027 (physics) 15h40 Start run 2028 (physics) 15h50 Start run 2029 (physics) 16h ... end of the shift

    Data Entry by: Serge Kox