• Main INDEX
  • Monthly INDEX
  • PREV
  • NEXT

    User name Saha

    Log entry time 10:43:58 on February10,2000

    Entry number 33344

    keyword=Beam conditions after PSS down

    Beam cobnditions after PSS break

    Fast Feedback on in absolute mode both in energy and position

    Beam is centered at target x:y = 0.017um: -0.004 um

    Harp scan with raster, see figure
    See also SPOT entry

    Restored beam at 100 uA. BCM trips above 105 uA (folklore).
    Testing this BCM trip limit. Still the same

    Started Run #2054


    FIGURE 1