    User name Ole Hansen

    Log entry time 23:58:09 on February10,2000

    Entry number 33452

    keyword=Shift Summary

    16:00-16:20 Waiting for beam
    16:20 70 uA arrive. Raster on.
    16:25 Start run 2070, target pressure is still 116 psi for now.
    16:45 Stop run 2070 at 1.3M events for high-current tests on 3He
    17:00 Accelerator managed to get 133 uA on target.
    Preparing for access.
    17:50 Spectrometers moved and set for elastic kinematics
    17:55 Start data taking ... rates are too low ... found target was moved out
    Runs 2071 and 2072 are mainly useful for background studies.
    18:25 Finished moving target. Start run 2073, elastic, same conditions
    as yesterday (runs 2026-2029).
    18:40 Run 2073 seems to be affected by deadtime fluctuations.
    Re-downloading DAQ. Run 2073 is probably not usable.
    18:42 Start run 2074.
    19:43 End run 2078, end of elastic data. Rates are very similar to yesterday.
    Starting current calibration run.
    21:45 - Current calibration finished.
    - Begin arc energy measurement.
    - Hadron spectrometer moved to 48.3 degrees in preparation for later
    elastic running.
    22:10 Beam problems. Arc measurements delayed.
    22:45 Beam returns. Arc measurements continue.
    23:30 Arc measurement finished. Beginning ep energy measurement preparations.
    23:55 ep ready, measurement begins.