• Main INDEX
  • Monthly INDEX
  • PREV
  • NEXT

    User name R. Michaels

    Log entry time 08:01:15 on February12,2000

    Entry number 33657

    keyword=owl shift summary

    Start kinematics 1,2 with beam spot 4x4mm, 10 microAmps.
    Run 2116.... some "ER1 disconnected" messages and increased deadtime.
    Run 2117.... junk
    Run 2118.....1.3 M events, good run.
    Run 2119.....1.3 M events, good run.
    Next we run the current up to 100 microAmps.
    Run 2120.....1.3 M events, good run.
    Run 2121.....1.3 M events, good run.
    Run 2122......0.63 M events, some high deadtime after event ~600K. Run should
    be ok up to that point. Stopped prematurely.
    Run 2123......1.3 M events, good run.
    Run 2124......1.3 M events, good run.
    Run 2125......1.3 M events, good run.
    Run 2126......1.3 M events, good run.
    Nobody on shift understood completely the statistics goal for this kinematics.
    From our interpretation of the instruction "40K with cuts", we're done.
    Next, 6 msr collimator run 1/2 hour.
    Run 2127.....short run without OTR.
    Run 2128.....500K events, good run. Lost beam at end (RF problems).
    Run 2129.....600K events, good run.
    Run 2130....junk. See halog about OTR background.
    Run 2131......A "no target" run (planned). No collimators.
    Run 2132.....Carbon (e,e'p) with 50 microAmps and raster off.
    Run 2133.....spot++ check with raster on.