• Main INDEX
  • Monthly INDEX
  • PREV
  • NEXT

    User name M. Rvachev

    Log entry time 15:58:13 on February13,2000

    Entry number 33864

    keyword=Shift summary

    ***Shift crew: Marat Rvachev, Eric Liatard, Michael Kuss***

    Continue taking data on kinematics 8.

    9:40 Asked for access to change target temperature sensors. Hall B is doing harp scan meanwhile.
    10:25 Access finished, continue taking data.
    11:05 Accelerator is doing injector problem diagnostic. Meanwhile changing to
    kin 7.
    For kinematics 7 we are running with OTR out, and put it in the beam for a few
    minutes ~every 1hour to check beam energy spread and make logbook entry
    about that (recommended by Nilanga for all shifts).

    11:25 Accelerator finished checks.
    13:25 MCC takes beam away for 15 minutes for some checks
    14:05 MCC takes beam away for 20 minutes for some checks again
    14:35 MCC takes beam away for 15 minutes again

    Summary of runs:
    Kin 8 runs:
    2178 1.3M, good run
    2179 1.15M, good
    2180 Raster adjustment run.
    2181 0.47M, good

    Changed hadron angle to kin 7
    2182 Harp scan, empty target
    2183 He3 run for raster size adjustment
    2184 1.3M, good
    2185 0.35M, good
    2186 0.24M, good
    2187, good, goes into next shift