Main INDEX
Monthly INDEX
PREV
NEXT
User name M. Rvachev
Log entry time 15:58:13 on February13,2000
Entry number 33864
keyword=Shift summary
***Shift crew: Marat Rvachev, Eric Liatard, Michael Kuss***
Continue taking data on kinematics 8.
9:40 Asked for access to change target temperature sensors. Hall B is doing harp scan meanwhile.
10:25 Access finished, continue taking data.
11:05 Accelerator is doing injector problem diagnostic. Meanwhile changing to
kin 7.
For kinematics 7 we are running with OTR out, and put it in the beam for a few
minutes ~every 1hour to check beam energy spread and make logbook entry
about that (recommended by Nilanga for all shifts).
11:25 Accelerator finished checks.
13:25 MCC takes beam away for 15 minutes for some checks
14:05 MCC takes beam away for 20 minutes for some checks again
14:35 MCC takes beam away for 15 minutes again
Summary of runs:
Kin 8 runs:
2178 1.3M, good run
2179 1.15M, good
2180 Raster adjustment run.
2181 0.47M, good
Changed hadron angle to kin 7
2182 Harp scan, empty target
2183 He3 run for raster size adjustment
2184 1.3M, good
2185 0.35M, good
2186 0.24M, good
2187, good, goes into next shift