    User name adaq

    Log entry time 00:03:40 on February 14, 2000

    Entry number 33892

    keyword=Beam Time Accounting
    Hall A

    2/13/2000 1600-2400
    Experiment #: E89-044
    Shift Leader: M. Epstein
    Shift Workers: S. Kox, P. Ulmer

    16001700180019002000210022002300Total Time
    Acceptable Beam
    in Use
    1 .5 1 .8 .8 1 .8 1. 6.9
    Beam Available
    but Not in Use
    0 0 0 .2 .2 0 .2 0 0.6
    Beam Not Available
    or Unacceptable
    0 .5 0 0 0 0 0 0 0.5
    Accelerator Con-
    figuration Chage
    0 0 0 0 0 0 0 0 0
    Experiment
    Ready
    1 .5 1 .8 .8 1 .8 1. 6.9
    Planned Config-
    uration Change
    0 0 0 0 0 0 0 0 0
    Unplanned
    Experiment Down
    0 .5 0 .2 .2 0 .2 01.1
    Hall not
    ready reasons
    Target 0 0 0 0 .2 0 0 0 0.2
    HRSe 0 0 0 0 0 0 0 0 0
    HRSh 0 0 0 0 0 0 0 0 0
    Data Acq 0 0 0 .2 0 0 0 0 0.2
    Other 0 0 0 0 0 0 0 0 0

    Comments: some trips so need machine checks at 5:15 PM After beam was restored, do a Harp scan at 6 PM Back to normal conditions at 6:15 PM Roc 14 failure in DAQ at 7:15 PM Target IOC rebooting at 8:45 PM OTR measurement at 11:15 PM Taking good data on Kin#7, (7M events overall)

    Data Entry by: S. Kox