User name Quemener
Log entry time 07:59:07 on February28,2000
Entry number 34882
keyword=Shift Summary
Shift Summary:
Till 02:00 we ran kinematics number 13
At 02:08 we changed to kinematics number 18:
HRSE angle to 20.893 degrees (measured angle) and momentum to 3.581 GeV/c. run number 2419.
At 02:52 HRSH configuration change theta_H = 41.25 deg (set angle) and P_H = 1.915 GeV/c.
03:52 Beam back start of kinematics number 18 data acquisition.
04:20 we asked for 120 micro Amperes, but beam is not stable so we went back to 110 micro Amperes.
06:14 Calibration runs: 10 cm Al dummy target raster ON and I = 30 micro Amperes. Then same tartget without raster and I = 5 micro Amperes. Ten same on 4 cm Al dummy target. Then 50 micro Amperes on the 12C target with raster OFF.
07:15 configuration change to kinematics 20. theta_E = 33.34 deg and P_E = 2.593 GeV/c.0