Main INDEX
Monthly INDEX
PREV
NEXT
User name Saha
Log entry time 11:53:36 on February28,2000
Entry number 34895
keyword=OTR signal
MCC working on OTR screen 11:10 - 11:50
Beam Width on screen was > 0.3 mm
Mcc reports there was a failutre in the OTR scripot. The beam width was always OK at the current value, 0.17 mm