Main INDEX
Monthly INDEX
PREV
User name x. Jiang
Log entry time 23:51:31 on February29,2000
Entry number 35076
keyword=shift activity.
16:32 Hall-C fast feedback check.
MCC said will take 5 minuts. Stop run 2466. wait.
16:36, take run 2467, energy feedback rf lock is on Hall-C line.
16:54 energy feedback lock on Hall-A again. start run 2468.
20:00, finished he-3 data taking with Kin#24. last run. 2470.
Move target to 10cm dummy.
20:04 10cm dummy run, raster on, the same prescale factor as before.
run 2471
20:33 2472 dummy 10 cm, 5 microA no raster, with FPP HV on nominal (note>:
was authorized by Arun Saha himself) CF Perdrisat
2473 DUMMY 4 CM 5 MA, NO RASTER
20:56-21:06 2474 C target, 30 mA, no raster.
start change configuration.
21:10 set up for kinematic 28.
set e-arm pe=3.966, cycle q2,q3 to 1600A.
Having problems on bogies_ea. call access at 21:30 to reset computer.
moved e-arm to 16.369.
22:00 turn off FPP HV before start of cross check run with hadron arm.
22:10 run 2475, e-arm at Kin 28, h-arm at Kin 24. 110 uA beam.
22:40 run 2476, e-arm at Kin28, 20uA beam.