• Main INDEX
  • Monthly INDEX
  • PREV
  • NEXT

    User name Finn

    Log entry time 07:57:34 on March 5,2000

    Entry number 35607

    keyword=run summary 03/05/00 00:00 to 08:00

    12:30 am setting beam size to 4 by 4 mm ^2
    MCC magnet current reads x=1.785 y=3.163

    12:35 am begin first elastics run on kinematics 90 out e_0=1.257 GeV

    Run 2587 12C elastics kinematics 90 out, theta_e=15.187 deg e'=1.2347 GeV
    Run 2588 12C elastics kinematics 90 out, raster off


    1:00 am move to 4 cm dummy target

    Run 2589 4 cm dummy raster off
    Run 2590 10 cm dummy raster off
    Run 2591 10 cm dummy raster on (raise current to 10 microamps)

    1:50 am move to 3He target

    Run 2592 3He elastics raster on, 2 microamps

    2:50 am change to kinematics 91 theta_e= 20.564 deg p>_e=1.2434 Gev

    Runs 2593-2600 junk
    Run 2601 3He elastics raster on, 5 microamps
    Run 2602 3He elastics

    3:50 AM go to 12 C target

    Run 2603 12C elastics raster off, 50 microamps

    4:18 am change to kinematics 92 out, theta_e=31.2 deg, e'=1201.5

    Run 2604 12C elastics raster off, 50 microamps

    Move to 3He, OTR out, fast feedback on

    final OTR x=0.12mm

    Run 2605 3He elastics 1.0M events, kinematics 92 out, raster on, 74 microamps
    Run 2606 3He elastics 1.5M events, kinematics 92 out, raster on, 60 microamps
    Run 2607 3He elastics 0.9M events
    Run 2608 3He elastics 1.8M events
    Run 2609 3He elastics 1.8M events
    Run 2610 3He elastics 1.0M events
    Run 2611 3He elastics 0.3M events
    Run 2612 3He elastics 1.8M events

    7:20 am change to kinematics 93 out, theta_e=37.0 deg, e'=1.1735 GeV

    Ask for maxiumum available current: get 100 microamps

    Run 2613 3He elastics 1.8M events, kinematics 93 out, theta_e 36.964 deg