Main INDEX
Monthly INDEX
PREV
NEXT
User name Eric Voutier
Log entry time 23:58:53 on March 6,2000
Entry number 35738
keyword=Shift summary
New Crew on shift: Eric Voutier, Rikki Roche/Dave Meekins, Olivier Gayou
***************
16:00 MCC is tuning the beam to improve the beam energy spread
16:35 Beam is now tuned with OTR width less than 200um at 25uA; we are checking
the beam spot size with an HARP scan.
16:40 Hall A/B/C are not satisfied by the beam optics; MCC call the optics crew to
adjust the beam tune; we'll be hopefully back in 2 hours.
17:50 Beam is back, proceeding through the control of the beam spot and of the
raster size (entry # 35711).
19:00 Ready to start data taking for kin#6 at 100uA with energy lock on Hall A.
21:45 The rate estimate for Kin#6 leads to 10 h (9.7M) data taking (entry # 35721).
23:00 Go to dummy and carbon targets before the end of the present shift to study
systematics; the next run will work on the increase of the statistics of Kin#6.
-# Run history
... 2636 ...... Cosmic
... 2637 ...... Cosmic
... 2638 ...... Spot++ check
... 2639 ...... Kin#6 / He3 / 1.0 M / good run / Sum = 1.0 M
... 2640 ...... Kin#6 / He3 / 1.0 M / good run / Sum = 2.0 M
... 2641 ...... Kin#6 / He3 / 1.0 M / good run / Sum = 3.0 M
... 2642 ...... Kin#6 / He3 / 1.0 M / good run / Sum = 4.0 M
... 2643 ...... Kin#6 / 10cm Dummy / good run (bad prescalers) / 1.4 k
... 2644 ...... Kin#6 / 10cm Dummy / good run / 345 k
... 2645 ...... Kin#6 / 4cm Dummy / good run / 160 k
... 2646 ...... Kin#6 / C12 starting at midnight