Main INDEX
Monthly INDEX
PREV
NEXT
User name markowitz
Log entry time 07:59:04 on March10,2000
Entry number 36090
keyword=shift summary
started shift taking data at kinematics 12
01:02 ROC 14 needs reset, ending run 2723
03:00 switching to harp scan. Did the first scan with the raster on (scan 628). Then ran with raster off (scan 631).
06:47 ts1 hangs. Ending run 2729.
06:55 MCC calls to say beam will be gone for about 5 minutes
07:03 MCC calls -- beam is back
07:21 The two monitors on adaqh2 and adaqs3 simultaneously had a power glitch, beeped and came back. Only the monitor was affected, not the CPU. Nothing else seemed to be affected.
07:35 beam gone. Mcc calls to say they will first send pulsed beam then restore CW beam.
07:40 Mcc calls. They lost an injector IOC and will be down for a few minutes while they bring it back up.
08:00 mcc updated us. It will be another 30-60 minutes to recover from a electrical trip.