• Main INDEX
  • Monthly INDEX
  • PREV
  • NEXT

    User name A. Hotta

    Log entry time 15:57:01 on March13,2000

    Entry number 36233

    keyword=Target operation at sleeping

    Target operation at sleeping, Maintainance period;
    March 13, 8:00 to 16:00
    8:00; M. Kuss set the parameters. See the Log of Kuss.
    11:00: Target experts were working on the cryosystem in the Hall A experimetal hall, during the period, the alarms came out.
    11:53: New parameters were set, after that the target running was stable.
    The parameters;
    Target temp. 6.30 K ( at CT170), Pressure P = 158.66 PSI ( at PT276),
    JTV #1 : 21.15 JTV #3; 23.96, Fan; 14% ( #1 & #3 )
    Coolant pressure P= 18.7 PSI ( at PT 83)
    VT cameras have been moved, we ,may need fix the positions for good view.