Main INDEX
Monthly INDEX
PREV
NEXT
User name M. Rvachev
Log entry time 08:03:35 on March27,2000
Entry number 37025
keyword=Shift summary
Shift crew ***Marat Rvachev, Fatiha Benmokhtar, Fernand Merchez***
23:45 Went in the hall to reset EQ3.
00:00 EQ3 reset and cycled to 1600A. Current in EQ1 and ED set manually to get
field readings close to set value.
00:24 Continue He3 production runs at kinematics 32.
2:49-3:00 OTR check: "x width" is 0.273mm.
3:28 MCC says they rebooted IOC SE10. At around te same time we lost BPM
signals on hac (see halog entry 37021). Someone has to fix this.
He3 production runs:
run#..ev(M)/sum.......time/sum.....comments
2964.....1/18.34..........1:11/22:02
2965.....1/19.34..........1:11/23:13
2966.....1/20.34..........1:10/24:23
2967.....1/21.34..........1:09/25:32
2968.....1/22.34..........1:10/26:42
2969...very short, no beam
2970.....1/23.34..........1:10/27:52
2971..continued