• Main INDEX
  • Monthly INDEX
  • PREV
  • NEXT

    User name M. Rvachev

    Log entry time 08:03:35 on March27,2000

    Entry number 37025

    keyword=Shift summary

    Shift crew ***Marat Rvachev, Fatiha Benmokhtar, Fernand Merchez***

    23:45 Went in the hall to reset EQ3.
    00:00 EQ3 reset and cycled to 1600A. Current in EQ1 and ED set manually to get
    field readings close to set value.
    00:24 Continue He3 production runs at kinematics 32.
    2:49-3:00 OTR check: "x width" is 0.273mm.

    3:28 MCC says they rebooted IOC SE10. At around te same time we lost BPM
    signals on hac (see halog entry 37021). Someone has to fix this.

    He3 production runs:
    run#..ev(M)/sum.......time/sum.....comments
    2964.....1/18.34..........1:11/22:02
    2965.....1/19.34..........1:11/23:13
    2966.....1/20.34..........1:10/24:23
    2967.....1/21.34..........1:09/25:32
    2968.....1/22.34..........1:10/26:42
    2969...very short, no beam
    2970.....1/23.34..........1:10/27:52
    2971..continued