• Main INDEX
  • Monthly INDEX
  • PREV
  • NEXT

    User name Adaq

    Log entry time 00:01:21 on March28,2000

    Entry number 37081

    keyword=shift summary


    fissum/cochran/roche

    2975.....1.00/28.04.....1h21m/34h00m.....529 mC
    2976.....DAQ problems at end of run, no stats
    2977.....junk, DAQ problems
    2978.....junk, DAQ problems
    2979.....1.00/29.04.....1h30m/35h30m.....524 mC
    2980.....1.00/30.04.....1h15m/36h45m.....528 mC
    2981.....1.00/31.04.....1h15m/38h00m.....528 mC
    2982.....1.00/32.04.....1h15m/39h15m.....525 mC

    A reasonable shift.

    Lost 15 minutes to the DAQ, 10 minutes to RF cavity work
    by MCC, and a total of 5 minutes over the rest of the shift
    to transient beamloss. Several very long, very good runs for
    kin32.