    16:15 MCC is trying to get beam back to do Arc energy measurement. TCarbon target is in. Raster is off.
    17:40, arc measurement done (Doug Higinbothom)
    18:00 begin harp scan, 160 umx230 um
    19:25 accept beam with harp scan results 59 um x 90 um .
    enabled raster, moved target to 3He.
    beam on target, 5 uA, spot size 4x4 mm^2
    start run in 32/23 kinematics at 19:40
    finished run # 2993 at 19:48, 805 K events.
    19:48 Started configuration change for kinematics # 23.
    The Hadron arm is moved to 25.52 deg. The Hadron arm
    momentum is set at 1.295 GeV/c.
    start 2994 at 20:20; event rate is 500 Hz. Got 1 M events. Good run.
    start 2995 at 20:59
    21:12 energy lock now on Hall A
    21:20 beam off due to RF problems. Stop Run 2995. 150 K events.
    21:50 MCC called. Water leak in injector. Will take several hours to cleanup.