    User name adaq

    Log entry time 09:11:43 on December 4, 1999

    Entry number 30573

    keyword=Beam Time Accounting
    Hall A

    12/4/1999 0000-0800
    Experiment #: gammap99
    Shift Leader: N. Liyanage
    Shift Workers: G. Quemener, M. Rvachev

    00000100020003000400050006000700Total Time
    Acceptable Beam
    in Use
    0 0 0 0.17 0.5 0.5 1 1 3.17
    Beam Available
    but Not in Use
    0 0 0 0.5 0.5 0.5 0 0 1.5
    Beam Not Available
    or Unacceptable
    0 0 0 0.33 0 0 0 0 0.33
    Accelerator Con-
    figuration Chage
    1 1 1 0 0 0 0 0 3
    Experiment
    Ready
    1 1 1 0.67 0.5 0.5 1 1 6.67
    Planned Config-
    uration Change
    0 0 0 0 0 0 0 0 0
    Unplanned
    Experiment Down
    0 0 0 0.33 0.5 0.5 0 01.33
    Hall not
    ready reasons
    Target 0 0 0 0 0 0 0 0 0
    HRSe 0 0 0 0 0 0 0 0 0
    HRSh 0 0 0 0.33 0.5 0.5 0 0 1.33
    Data Acq 0 0 0 0 0 0 0 0 0
    Other 0 0 0 0 0 0 0 0 0

    Comments: Took time to reset hadron Q1 and Q3. Planned optics measurements required beam position fast feedback on, which was not available. So the measurements made today should be repeated when FF is available.

    Data Entry by: M. Rvachev