0800 | 0900 | 1000 | 1100 | 1200 | 1300 | 1400 | 1500 | Total Time | |
---|---|---|---|---|---|---|---|---|---|
Acceptable Beam in Use | 1 | 54 | 1 | 50 | 40 | 0 | 1 | 1 | 6.4 |
Beam Available but Not in Use | 0 | 0 | 0 | 0 | 0 | 1 | 0 | 0 | 1 |
Beam Not Available or Unacceptable | 0 | 6 | 0 | 10 | 20 | 0 | 0 | 0 | 0.6 |
Accelerator Con- figuration Chage | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
Experiment Ready | 1 | 1 | 1 | 1 | 1 | 0.5 | 1 | 1 | 7.5 |
Planned Config- uration Change | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
Unplanned Experiment Down | 0 | 0 | 0 | 0 | 0 | 0.5 | 0 | 0 | 0.5 |
Hall not ready reasons | |||||||||
Target | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
HRSe | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
HRSh | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
Data Acq | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
Other | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
Comments: 8: 00 continuing eP energy measurementr begun at 6:30. 9:00 Start systematic studies for eP energy measurement device. 11:50 MCC check and IOC reboot (took 30 mm). 12.20 beam back. 13.24. beam down because need a controled access to resset a quad. 1324. eP energy measurement and systematic studies done. 13:25 controled access. 14:00 Starting optics measurements.
Data Entry by: A. Deur