    Log entry time 16:12:55 on December 5, 1999

    Entry number 30637

    keyword=Beam Time Accounting
    Hall A

    12/5/1999 0800-1600
    Experiment #: gammap99
    Shift Leader: A. Deur
    Shift Workers: Y. Roblin

    08000900100011001200130014001500Total Time
    Acceptable Beam
    in Use
    1 54 1 50 40 0 1 1 6.4
    Beam Available
    but Not in Use
    0 0 0 0 0 1 0 0 1
    Beam Not Available
    or Unacceptable
    0 6 0 10 20 0 0 0 0.6
    Accelerator Con-
    figuration Chage
    0 0 0 0 0 0 0 0 0
    Experiment
    Ready
    1 1 1 1 1 0.5 1 1 7.5
    Planned Config-
    uration Change
    0 0 0 0 0 0 0 0 0
    Unplanned
    Experiment Down
    0 0 0 0 0 0.5 0 00.5
    Hall not
    ready reasons
    Target 0 0 0 0 0 0 0 0 0
    HRSe 0 0 0 0 0 0 0 0 0
    HRSh 0 0 0 0 0 0 0 0 0
    Data Acq 0 0 0 0 0 0 0 0 0
    Other 0 0 0 0 0 0 0 0 0

    Comments: 8: 00 continuing eP energy measurementr begun at 6:30. 9:00 Start systematic studies for eP energy measurement device. 11:50 MCC check and IOC reboot (took 30 mm). 12.20 beam back. 13.24. beam down because need a controled access to resset a quad. 1324. eP energy measurement and systematic studies done. 13:25 controled access. 14:00 Starting optics measurements.

    Data Entry by: A. Deur