• Main INDEX
  • Monthly INDEX
  • PREV
  • NEXT

    User name adaq

    Log entry time 00:41:37 on December 6, 1999

    Entry number 30684

    keyword=Beam Time Accounting
    Hall A

    12/5/1999 1600-2400
    Experiment #: gammap99
    Shift Leader: A Saha
    Shift Workers:

    16001700180019002000210022002300Total Time
    Acceptable Beam
    in Use
    1 1 1 30 50 5 20 1 5.75
    Beam Available
    but Not in Use
    0 0 0 0 10 30 0 0 0.666666666666667
    Beam Not Available
    or Unacceptable
    0 0 0 30 0 25 40 0 1.58333333333333
    Accelerator Con-
    figuration Chage
    0 0 0 0 0 0 0 0 0
    Experiment
    Ready
    1 1 1 1 50 30 1 1 7.33333333333333
    Planned Config-
    uration Change
    0 0 0 0 0 0 0 0 0
    Unplanned
    Experiment Down
    0 0 0 0 10 30 0 00.666666666666667
    Hall not
    ready reasons
    Target 0 0 0 0 0 0 0 0 0
    HRSe 0 0 0 0 0 0 0 0 0
    HRSh 0 0 0 0 10 30 0 0 0.666666666666667
    Data Acq 0 0 0 0 0 0 0 0 0
    Other 0 0 0 0 0 0 0 0 0

    Comments: 16:00 Optics measurement data taking.strip chartsstrip charts 19:00 Fast Feed Back broken, the expert has been called in MCC 19:30 Fast Feed Back repaired. 20:50 HQ1 quenched, tech on call is coming 21:30 Magnets back 21:35 beam off for Hall B normalization run

    Data Entry by: M. Kuss