1600 | 1700 | 1800 | 1900 | 2000 | 2100 | 2200 | 2300 | Total Time | |
---|---|---|---|---|---|---|---|---|---|
Acceptable Beam in Use | 1.0 | 0.9 | 0.2 | 0 | 0 | 0 | 0 | 0 | 2.1 |
Beam Available but Not in Use | 0 | 0.1 | 0.8 | 0.5 | 0 | 0 | 0 | 0 | 1.4 |
Beam Not Available or Unacceptable | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
Accelerator Con- figuration Chage | 0 | 0 | 0 | 0.5 | 1.0 | 1.0 | 1.0 | 1.0 | 4.5 |
Experiment Ready | 1.0 | 0.9 | 0.2 | 0 | 1.0 | 1.0 | 1.0 | 1.0 | 6.1 |
Planned Config- uration Change | 0 | 0 | 0.8 | 1.0 | 0 | 0 | 0 | 0 | 1.8 |
Unplanned Experiment Down | 0 | 0.1 | 0 | 0 | 0 | 0 | 0 | 0 | 0.1 |
Hall not ready reasons | |||||||||
Target | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
HRSe | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
HRSh | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
Data Acq | 0 | 0.1 | 0 | 0 | 0 | 0 | 0 | 0 | 0.1 |
Other | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
Comments: Both the electron arm and hardron arm have changed in energy and angle. We are now waiting for 4 GeV beam from MCC.
Data Entry by: D.W.Higinbotham