Main INDEX
Monthly INDEX
PREV
NEXT
User name Templon
Log entry time 15:46:54 on December 21,1999
Entry number 31691
keyword=beam is back, nilanga pointing
change config to nilanga pointing, 12c target.
following done:
raster off
check OTR spot and beam pos'n : OK
fast feedback is on both posn and energy, absolute mode
checked with operator that Hall A line tune is normal (not ep mode)
prescale factors being checked with 20 uA beam