    Log entry time 08:02:30 on October 1, 2000

    Entry number 48858

    keyword=Beam Time Accounting
    Hall A

    10/1/2000 0000-0800
    Experiment #: e97111
    Shift Leader: McCormick
    Shift Workers: J. Templon

    00000100020003000400050006000700Total Time
    Acceptable Beam
    in Use
    1 1 40 1 1 0 0 0 4.66666666666667
    Beam Available
    but Not in Use
    0 0 20 0 0 1 1 1 3.33333333333333
    Beam Not Available
    or Unacceptable
    0 0 0 0 0 0 0 0 0
    Accelerator Con-
    figuration Chage
    0 0 0 0 0 0 0 0 0
    Experiment
    Ready
    1 1 40 1 1 0 0 0 4.66666666666667
    Planned Config-
    uration Change
    0 0 0 0 0 1 0 0 1
    Unplanned
    Experiment Down
    0 0 20 0 0 0 1 12.33333333333333
    Hall not
    ready reasons
    Target 0 0 0 0 0 0 0 0 0
    HRSe 0 0 0 0 0 0 1 1 2
    HRSh 0 0 0 0 0 0 0 0 0
    Data Ac 0 0 0 0 0 0 0 0 0
    Other 0 0 0 0 0 0 0 0 0

    Comments: 12-3 Finish optics studies Between 2-3 there was a slight problem with the DAQ. I was trying to run ESPACE on the data file at the same time it was being taken and we were getting the error that the ER was backed-up. This went away when ESPACE was killed and coda was restarted. 3-4 Open JT valve in preparation for target tests. Start electronics deadtime studies. lost time near end of shift (left spectrometer) due to angle change not working properly.

    Data Entry by: K. McCormick