• Main INDEX
  • Monthly INDEX
  • PREV
  • NEXT

    User name adaq

    Log entry time 23:58:29 on October 7, 2000

    Entry number 49721

    keyword=Beam Time Accounting
    Hall A

    10/7/2000 1600-2400
    Experiment #: e97111
    Shift Leader: weinstein
    Shift Workers: jiang, jans

    16001700180019002000210022002300Total Time
    Acceptable Beam
    in Use
    1 1 1 1 50 23 1 1 7.21666666666667
    Beam Available
    but Not in Use
    0 0 0 0 10 37 0 0 0.783333333333333
    Beam Not Available
    or Unacceptable
    0 0 0 0 0 0 0 0 0
    Accelerator Con-
    figuration Chage
    0 0 0 0 0 0 0 0 0
    Experiment
    Ready
    1 1 1 1 50 23 1 1 7.21666666666667
    Planned Config-
    uration Change
    0 0 0 0 0 0 0 0 0
    Unplanned
    Experiment Down
    0 0 0 0 10 37 0 00.783333333333333
    Hall not
    ready reasons
    Target 0 0 0 0 0 0 0 0 0
    HRSe 0 0 0 0 0 0 0 0 0
    HRSh 0 0 0 0 0 0 0 0 0
    Data Ac 0 0 0 0 10 20 0 0 0.5
    Other 0 0 0 0 0 17 0 0 0.283333333333333

    Comments: wasted 17 minutes letting Hall B measure beam polarization with Hall A beam off. Next time, have Hall B turn off their laser to measure the current they get from Hall A directly.

    Data Entry by: weinstein