Run # Start Stop # Events Comments
1760 07:43 08:19 1.2M Good run
1761 08:20 08:49 1.2M "
1762 08:51 09:25 1.2 M "
1763 09:26 09:58 1.2M "
1764 09:59 10:32 1.2M "
1765 10:33 11:02 1.2M "
1766 11:03 11:26 1.0M Run ended for BCM calibration run
1767 Failed BCM calibration run
1768 Second BCM calibration run, successful.
11h45 BCM-calibration on empty target
12h10 second try for BCM-calibration after trips of BCM's
Remedy: slowly up and then drop fast from 100 microA to 0
12:40 Ended BCM calibration run. Put 4He target back for production run.
12:55 Back on production run.
1769 12:52 13:30 1.2M Roc14 complained at end of run,
restarted CODA
1770 13:35 ROC 14 failed, run ended
1771 13:58 14:27 1.2M
1772 14:28 15:03 1.2M
1773 15:04 ROC 14 failed again (@15:15), run ended.
1774 15:21 15:23 80K Ended run to do harp scan as requested by MCC.
15:30 Target control hanged while moving to 12C. Reboot target controil.
16:00 At end of this swhift, we are still trying to do harp scan.