Main INDEX
Monthly INDEX
PREV
NEXT
User name x. jiang
Log entry time 08:01:27 on October13,2000
Entry number 50279
keyword=shift summary
00:00am start shift with production run 1793 at kinematics PY-2E.
1:04 am right arm-Q3 tripped, cycled to 1400Amp and reset to P0=1.8997 GeV
on Q3.
1:20 am Q3 ready. start run 1796 at 1:25 am
run 1793 1.2 M
run 1794 1.2 M
run 1795 1.1 M
run 1796 1.2 M
run 1797 1.2 M
2:28 am move to c12 target.
run 1798 c12 pointing run
2:50 am start setting right arm to p0=1627.0 theta0=32.54 degree
3:20 right-arm Q3 tripped again, liquid level was at 46% on Q3
cycle Q3 and reset.
3:40 ready to take beam when MCC start QE measurement.
3:52 start run 1799 He-4 link run.
run 1799 1.2 M link run
run 1800 0.87 M link run.
4:20 start setting left arm to p0=2.185, cycle Q2 and Q3 to 1600 Amp.
4:35 start run 1801, production , kinematics PY-2D. 70 uA beam start.
ask 90uA at 4:38
run 1801 0.3 M changing beam current from 70 to 90 uA.
run 1802 0.5 M
5:00 am Right-arm Q3 tripped again. cycle andc reset.
5:12 am start run 1803.
6:30 Coda crashed. Reboot ROC14, ROC2, ROC1
run 1803 1.2 M
run 1804 1.2 M
run 1805 0.4 M
run 1806 1.2 M
run 1807 0.46 M
7:30 am Moved target to c12
run 1808 1.0M C12 pointing run
8:00 am end shift with 10 cm dummy run