    User name adaq

    Log entry time 08:01:04 on October 15, 2000

    Entry number 50458

    keyword=Beam Time Accounting
    Hall A

    10/15/2000 0000-0800
    Experiment #: e97111
    Shift Leader: R. Michaels
    Shift Workers: D. Rohe, X.Zheng

    00000100020003000400050006000700Total Time
    Acceptable Beam
    in Use
    1 1 1 45 1 1 30 1 7.25
    Beam Available
    but Not in Use
    0 0 0 0 0 0 30 0 0.5
    Beam Not Available
    or Unacceptable
    0 0 0 15 0 0 0 0 0.25
    Accelerator Con-
    figuration Chage
    0 0 0 0 0 0 0 0 0
    Experiment
    Ready
    1 1 1 1 1 1 30 1 7.5
    Planned Config-
    uration Change
    0 0 0 0 0 0 0 0 0
    Unplanned
    Experiment Down
    0 0 0 0 0 0 30 00.5
    Hall not
    ready reasons
    Target 0 0 0 0 0 0 0 0 0
    HRSe 0 0 0 0 0 0 0 0 0
    HRSh 0 0 0 0 0 0 0 0 0
    Data Ac 0 0 0 0 0 0 30 0 0.5
    Other 0 0 0 0 0 0 0 0 0

    Comments: Production at CQO-2A kinematics. A bit rocky. Crashes of roc14, roc1 etc (CODA), and also IOCs on beamline, and Moller quads. HV turned itself off on R-arm. The current on L-arm Q2 is fluctuating by +/- 0.3%. After roc14 crashed 5 times, we took access and swapped the cpu. My impression is that high radiation is frying roc14 and the network switch near the beamline

    Data Entry by: R. Michaels