    User name R. Michaels

    Log entry time 08:02:21 on October16,2000

    Entry number 50513

    keyword=owl shift

    crew: R.M., D. Rohe, E. Penel
    Run 1889 in progress at start of shift.
    Kinematics CQO-2B with
    p_L=3427, theta_L=20.848, p_R=1040.9, theta_R=68.297
    Run......Start/Stop.......Events......Comment
    1889.....in prog/0:02.....0.6M.......All ROCs lost connection (192 switch problem)
    1890.....0:05/1:23.........0.97M......Stopped so MCC could do Q.E. measurement
    1891.....1:37/3:14.........1.2M
    1892.....3:14/4:53.........1.2M
    1893.....4:54/6:12.........0.95M.....ended because ``lost connection to TS0''
    1894.....6:14/8:00.........1.2M
    1895......very brief....
    At 08:00, MCC takes the beam for machine development.
    Empty target put in place.