Main INDEX
Monthly INDEX
PREV
NEXT
User name rohe
Log entry time 16:08:28 on Oktober26,2000
Entry number 50932
keyword=day shift summary
8:00 left spectrometer does not move --> controlled access
cycled left spec. to 3.924
(beam accounting died)
8:25 Ed Folt can't move it --> Joe Mitchell decided to go on with CQO-3
set left spec. to 3.465 back -- moved Left ARM BY ~ 15 VERNIER MARKS
8:43 RUN 2057 (CQO-3) New angle is 20.758 deg
9:48 stopped 2057 because beam off (RF communication problem)
--> controlled access (it took 1 h to get there !) for target change and repair of
spectrometer rotation
~12.30 spectrometer rotation is working now
The vernier maker for left spectrometer is very hard to read (jitter).
So I was down and verified that it is actually +32 (for the next H2 measurement (laying on my knees ...)
16:00 left gas master is bieping: Hadron shield hut has 30 % to blow up (C.3=29%)!
Target not ready yet but the accelerator is (in principle)