    User name perdrisa

    Log entry time 23:56:46 on October26,2000

    Entry number 50968

    keyword=swing shift log

    LH2 target cooling completed at 17:25. Target chamber vacuum 2-3x10^-5
    18:30 harp #1147 with coda run # 2058: 112 m, 26 m this not being a razor like beam, we proceed.
    first kinematics 79.965/18.587 degrees
    20:35 go to C, 5 mA no raster run2059
    18:57 start 15 cm dummy run 2060.
    19:16 repeat after downloading trigger, run 2061
    beam taken away for 15 to start hall C
    19:49 LH2 target (15 cm), 30 mA, run 2062
    chryolimited to 150 W of beam, ESR does not deliver enough cooling power.
    20:32 continue LH2, run 2063
    change kin. 66.472/23.258 degrees
    21:30 LH2, 30 mA, run 2064, 2065
    22:39 15 cm dummy, run 2066
    22:57 C-target run 2067
    vacuum in target chamber 4x10^-5, noisy signal
    change to 3rd kinematics at 23:13 (52.469/29.748 degree)
    23:52 start run 2068 on C, 30 mA
    end of shift