User name Punjabi+Nanda
Log entry time 23:58:41 on Oktober27,2000
Entry number 51123
keyword=Shift Summary
16:20 Elastic Hydrogen run 2113 with new magnet settings..
Sieve slit still in left arm! Run 2113 is junk. abort run.
16:40 Put 6 msr collimator in, Start run 2114, first good run
17:10 Change to 15 cm dummy target, Run 2115
17:30 Cabon target in, rastor off, Run 2116
17:30 CODA problems. Dead time 100 %. stopped run 2116.
17:36 started run 2117 for carbon pointing awith 30 microamp.
18:30 New Magnet settings, left=46.93, right=29.48
18:23 Run 2118, junk run, 2119 also junk, wrong prescalers
18:32 Run 2120 with correct prescalers
18:45 Go to dummy Target Run 2121
18:57 Beam off
End run with 127 K events, switch to H2 target
19:00 moved to hydrogen target
19:10 beam back.
19:10 start run 2122 with hydrogen target and 10 microamp
19:30 stop run 2122
19:30 start run 2123 with 20 microamp
19:40 stop run 2123
19:40 go to new kinematics settings
19:45 Gas alarm. Found that Ethane bottle was Empty. Sirish and Doug changed the bottle.
20:00 New Magnet settings, left arm =38.706, right arm=38.712
20:19 started run 2124 with hydrogen target and 30 microamps
20:25 coda crashed. no end of run
20:30 started run 2125, hydrogen target, 30 microamps
21:02 stopped run 2125
21:10 start run 2126, 15 cm dummy target, 30 microamps
21:22 stopped run 2126
21:28 start run 2127, carbon target, 30 microamp
21:41 stopped run 2127
21:42 set all magnets on left arm to zero current to change polarity
22:05 Mark stevents went to the hall to change the polarity in left arm from positive to negative
22:30 Polarity is changed on left arm. Now setting the field.
22:50 Cycle field on left Q2/Q3
23:30 Bob arrived to do trigger setup. Make Hall Access
00:00 Bob is in hall working on trigger