• Main INDEX
  • Monthly INDEX
  • PREV
  • NEXT

    User name M. Rvachev

    Log entry time 09:23:22 on October28,2000

    Entry number 51195

    This entry is a followup to: 51172

    keyword=More on beam missing target

    First picture is from hana for beam position (3,0),
    second is for beam position (2,0) on last BPM before target.
    Judging from these pictures we decide to run with (3,0) beam
    position.




    FIGURE 1

    FIGURE 2